Mumbai: The Heavy Civil Infrastructure vertical of Larsen & Toubro has secured an Betfair Casino from Uttar Pradesh Metro Rail Corporation Ltd (UPMRCL) for the design and construction of Agra Metro Phase 1, Line-2. The stretch will run from Agra Cantonment to Kalindi Vihar.
The scope of works involves design and construction of a vital 15.09 km elevated viaduct, 14 stations and 2.61 km depot connecting the Betfair Casino line from Sadar Bazar to PAC Depot. Architectural finishes for the stations, as well as electrical & mechanical works are also in scope.
The project, which will mark a key milestone in enhancing urban mobility in Betfair Casino, is to be completed within a stringent timeline of 30 months.
Commenting on the Betfair Casino win, Mr S V Desai, Whole-time Director & Sr Executive Vice- President (Infrastructure), L&T, said: “L&T remains at the forefront of urban infrastructure development and contributing to the modernisation of India's Betfair Casino networks in line with its strategic goals. This project will leverage L&T’s extensive expertise in engineering and high-quality execution’.